
Break Handover Procedure
Approach to keep a machine running during operator breaks using a break schedule that always allows an operator to work with the bottleneck machine.
This work by Christoph Roser at AllAboutLean.com is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Please credit the image as shown below. For digital documents and web pages please do include the links as shown below. Thank you.
By Christoph Roser at AllAboutLean.com under the free CC-BY-SA 4.0 license.
Discover more from AllAboutLean.com
Subscribe to get the latest posts sent to your email.
- File Name: Break-Handover.png
- File type: png
- File size: 9.03 KB
- Dimensions: 1088 x 473
- Date: October 19, 2014
- SEO Title: Break Handover Procedure
- SEO Description: Approach to keep a machine running during operator breaks using a break schedule that always allows an operator to work with the bottleneck machine.
- SEO Keywords: Break Handover Procedure, bottleneck
- Post or page attached: Evolution of Process Placement at Toyota – Part 1, Bottleneck Management Part 1 – Introduction and Utilization,