Takt Times Two and Four Door Example

Takt Times Two and Four Door Example

Takt Times Two and Four Door Example

Graph showing the individual cycle times (or line takts) that give together the target cycle time (or line takt) for two product types (two door and four door car) with varying quantities/ratios.

Creative Commons LicenseThis work by Christoph Roser at AllAboutLean.com is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Please credit the image as shown below. For digital documents and web pages please do include the links as shown below. Thank you.

By Christoph Roser at AllAboutLean.com under the free CC-BY-SA 4.0 license.
  • File Name: Takt-Times-Two-Four-Door-Example.png
  • File type: png
  • File size: 35.30 KB
  • Dimensions: 1557 x 796
  • Date: May 10, 2019
  • SEO Title: Takt Times Two and Four Door Example
  • SEO Description: Graph showing the individual cycle times (or line takts) that give together the target cycle time (or line takt) for two product types (two door and four door car) with varying quantities/ratios.
  • SEO Keywords: Product Dependent Workload, sequencing, perlenkette, capacity adjustment
  • Post or page attached: Mixed Model Sequencing – Basic Example Introduction,
Many but not all of the images on this blog are under a Creative Commons License. If and only if the image above is under a Creative Commons license, you can find details for the different licenses at the Creative Commons. The most common licenses are Attribution CC-BY 2.0; 2.5; 3.0; and 4.0; and Attribution Share Alike CC-BY-SA 2.0; 2.5; 3.0; and 4.0;
Cookie Consent with Real Cookie Banner