
Takt Times Two and Four Door Example
Graph showing the individual cycle times (or line takts) that give together the target cycle time (or line takt) for two product types (two door and four door car) with varying quantities/ratios.
This work by Christoph Roser at AllAboutLean.com is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Please credit the image as shown below. For digital documents and web pages please do include the links as shown below. Thank you.
By Christoph Roser at AllAboutLean.com under the free CC-BY-SA 4.0 license.
- File Name: Takt-Times-Two-Four-Door-Example.png
- File type: png
- File size: 38.56 KB
- Dimensions: 1557 x 796
- Date: May 10, 2019
- SEO Title: Takt Times Two and Four Door Example
- SEO Description: Graph showing the individual cycle times (or line takts) that give together the target cycle time (or line takt) for two product types (two door and four door car) with varying quantities/ratios.
- SEO Keywords: Product Dependent Workload, sequencing, perlenkette, capacity adjustment
- Post or page attached: Mixed Model Sequencing – Basic Example Introduction,