
Example of OEE losses for a machine or process with an OEE of 67%
Example of OEE losses for a machine or process with an OEE of 67%. 18 parts were lost to lacking availability, 10 parts due to speed problems, and 5 parts were scrapped or reworked. As a result the overall OEE is 67 percent.
This work by Christoph Roser at AllAboutLean.com is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Please credit the image as shown below. For digital documents and web pages please do include the links as shown below. Thank you.
By Christoph Roser at AllAboutLean.com under the free CC-BY-SA 4.0 license.
Discover more from AllAboutLean.com
Subscribe to get the latest posts sent to your email.
- File Name: OEE-Losses-example.png
- File type: png
- File size: 9.87 KB
- Dimensions: 1098 x 444
- Date: August 25, 2013
- SEO Title: Example of OEE losses
- SEO Description: Example of OEE losses for a machine or process with an OEE of 67%. 18 parts were lost to lacking availability, 10 parts due to speed problems, and 5 parts were scrapped or reworked.
- SEO Keywords: OEE, availability, quality, speed, losses, muda
- Post or page attached: The Grand Tour of Japanese Automotive – Honda Kumamoto, More on TWI Programs, JM: Training within Industry – Job Methods, JR: Training within Industry – Job Relations, JI: Training within Industry – Job Instructions, Training within Industry – TWI – Oldies but Goldies, Line Balancing Part 3 – OEE Caveats, How to Measure OEE, What is OEE? – Definition of OEE,