Constraint Management in Manufacturing Systems

Constraint Management in Manufacturing Systems

Constraint Management in Manufacturing Systems

Roser, Christoph, Masaru Nakano, and Minoru Tanaka. “Constraint Management in Manufacturing Systems.” International Journal of the Japan Society of Mechanical Engineering, Series C, Special Issue on Advanced Scheduling 46, no. 1 (March 1, 2003): 73–80.

This paper provides a novel method for detecting production bottlenecks and the shifting of the production bottlenecks. All production systems are constrained by one or more bottlenecks. Improving the bottleneck will improve the whole production system. Yet, finding the bottleneck is no trivial task. Furthermore, the system may change over time or due to random events, and subsequently the bottleneck may shift from one machine to another machine. The presented active duration method determines the bottleneck based on the duration a machine is active without interruption. The method is very robust, easy to apply and able to detect the primary and secondary bottlenecks in a wide range of production systems. The method is demonstrated using different examples. The measurement of the likelihood of a machine being the bottleneck aids in the decision-making regarding the allocation of the available resources.

  • File Name: Roser-et-al.-2003-Constraint-Management-in-Manufacturing-Systems.pdf
  • File type: pdf
  • File size: 371.83 KB
  • Date: September 8, 2016
  • SEO Title: Constraint Management in Manufacturing Systems
  • SEO Description: Roser, Christoph, Masaru Nakano, and Minoru Tanaka. “Constraint Management in Manufacturing Systems.” International Journal of the Japan Society of Mechanical Engineering, Series C, Special Issue on Advanced Scheduling 46, no. 1 (March 1, 2003): 73–80. This paper provides a novel method for detecting production bottlenecks and the shifting of the production bottlenecks. All production systems are constrained by one or more bottlenecks. Improving the bottleneck will improve the whole production system. Yet, finding the bottleneck is no trivial task. Furthermore, the system may change over time or due to random events, and subsequently the bottleneck may shift from one machine to another machine. The presented active duration method determines the bottleneck based on the duration a machine is active without interruption. The method is very robust, easy to apply and able to detect the primary and secondary bottlenecks in a wide range of production systems. The method is demonstrated using different examples. The measurement of the likelihood of a machine being the bottleneck aids in the decision-making regarding the allocation of the available resources.
  • SEO Keywords: Flexible Manufacturing System, FMS, Manufacturing Bottlenecks, Operation Planning, Production Management
Many but not all of the images on this blog are under a Creative Commons License. If and only if the image above is under a Creative Commons license, you can find details for the different licenses at the Creative Commons. The most common licenses are Attribution CC-BY 2.0; 2.5; 3.0; and 4.0; and Attribution Share Alike CC-BY-SA 2.0; 2.5; 3.0; and 4.0;