Inventory subject to Change Over Two Parts Two Cycles
Change of inventory over time for two parts and a change over in between for normal and half duration change over with half the lot size.
This work by Christoph Roser at AllAboutLean.com is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Please credit the image as shown below. For digital documents and web pages please do include the links as shown below. Thank you.
By Christoph Roser at AllAboutLean.com under the free CC-BY-SA 4.0 license.
Discover more from AllAboutLean.com
Subscribe to get the latest posts sent to your email.
- File Name: Inventory-CO-Two-Parts-Two-Runs.png
- File type: png
- File size: 18.54 KB
- Dimensions: 792 x 415
- Date: May 12, 2017
- SEO Title: Inventory subject to Change Over Two Parts Two Cycles
- SEO Description: Change of inventory over time for two parts and a change over in between for normal and half duration change over with half the lot size.
- SEO Keywords: SMED, inventory, change over, lot size, efficiency
- Post or page attached: Reducing Lead Time 3 – Throughput and Lot Size, What to Do with SMED: Reduce Lot Size or Increase Work Time?,