An Economic Design Change Method

An Economic Design Change Method

An Economic Design Change Method

Roser, Christoph, David O Kazmer, and James Rinderle. “An Economic Design Change Method.” ASME Journal of Mechanical Design 125, no. 2 (2003): 233–39.

New product design as well as design revision to remedy defects is complicated by an inability to precisely predict product performance. Designers often find that they are confident about the performance of some design alternatives and uncertain about others. Similarly, alternative design changes may differ substantially in uncertainty, potential impact, and cost. This paper describes a method for including the effects of uncertainty in the evaluation of economic benefits of various design change options. The results indicate that the most profitable change option sequence depends not only on relative costs but also on the relative degree of uncertainty and on the magnitude of the potential design defects. The method demonstrates how design change alternatives can be compared using the engineering design of a beam. Finally, the validity of some common engineering change heuristics are discussed relative to their associated, quantitatively determined limits.


Discover more from AllAboutLean.com

Subscribe to get the latest posts sent to your email.

  • File Name: Roser-et-al.-2003-An-Economic-Design-Change-Method.pdf
  • File type: pdf
  • File size: 504.25 KB
  • Date: September 8, 2016
  • SEO Title: An Economic Design Change Method
  • SEO Description: Roser, Christoph, David O Kazmer, and James Rinderle. “An Economic Design Change Method.” ASME Journal of Mechanical Design 125, no. 2 (2003): 233–39. New product design as well as design revision to remedy defects is complicated by an inability to precisely predict product performance. Designers often find that they are confident about the performance of some design alternatives and uncertain about others. Similarly, alternative design changes may differ substantially in uncertainty, potential impact, and cost. This paper describes a method for including the effects of uncertainty in the evaluation of economic benefits of various design change options. The results indicate that the most profitable change option sequence depends not only on relative costs but also on the relative degree of uncertainty and on the magnitude of the potential design defects. The method demonstrates how design change alternatives can be compared using the engineering design of a beam. Finally, the validity of some common engineering change heuristics are discussed relative to their associated, quantitatively determined limits.
  • SEO Keywords: design change, cost, efficiency
Many but not all of the images on this blog are under a Creative Commons License. If and only if the image above is under a Creative Commons license, you can find details for the different licenses at the Creative Commons. The most common licenses are Attribution CC-BY 2.0; 2.5; 3.0; and 4.0; and Attribution Share Alike CC-BY-SA 2.0; 2.5; 3.0; and 4.0;
Cookie Consent with Real Cookie Banner